Storage · Backup · Solar — [CITY, STATE]

Battery storage and backup power for homes and small businesses.

[PLACEHOLDER: 1–2 sentences covering new solar + storage, retrofit onto an existing array, and backup-only installations — client to supply]

[CONTRACTOR LICENCE # — CONFIRM] · [STATE]

Modular battery cabinet with one drawer open and a small display panel, in cool low light

Backup scope

Whole home or critical loads

The difference customers most often misunderstand — and the one to settle before anything is installed.

Whole home

Everything on the panel is backed up

[PLACEHOLDER: 2–3 sentences — client to supply]

Requires [CONFIRM — sufficient battery capacity and panel/transfer equipment]

Partial / critical loads

A defined subset stays on

Typically via a separate critical-loads subpanel. [PLACEHOLDER: 2–3 sentences — client to supply]

Load picker — tick what you'd want kept on

Configuration category

Select the circuits you'd want kept on.

Indicative only. Actual backup scope and duration depend on your battery capacity, your loads and your electrical panel, and are determined at the site assessment.

Load management

Controlling high-draw circuits

Load management sheds or controls high-draw circuits during an outage so that stored energy is spent on what matters most. [PLACEHOLDER: 2–3 sentences — client to supply]

  • Smart-panel approach [CONFIRM — client's equipment]
  • Relay / load-controller approach [CONFIRM]
  • Loads typically managed: air conditioning, electric range, EV charging, well pump
Recessed electrical subpanel with breakers in a pale wall

Time-of-use shifting

Charging at one time, using at another

A battery can charge at one time of day and discharge at another, under your own utility tariff. Whether that matters for you depends entirely on that tariff.

[PLACEHOLDER: 2–3 sentences — client to supply]

Rate structure

[TIME-OF-USE RATE STRUCTURE — VERIFY CLIENT'S STATE AND UTILITY]

Export

[NET METERING / EXPORT RATE — VERIFY CLIENT'S STATE AND UTILITY]

How a battery is sized

Four factors

Usable capacity[kWh — CONFIRM]
Continuous output[kW — CONFIRM]
Surge / starting capacity[kW — CONFIRM]
Loads you want backed upAgreed at assessment

Backup duration is a function of capacity and actual load. It is determined at the assessment, not on a website.

Incentives and programme status

Incentives

[PLACEHOLDER — client's own current, verified incentive summary. Must be reviewed by their tax professional.]

[INCENTIVE — VERIFY CURRENT FEDERAL, STATE AND UTILITY STATUS AT BUILD TIME]

Programme status

Equipment

Component lines

  • Reserve-series LFP battery moduleUsable capacity [CONFIRM] · Chemistry [CONFIRM]
  • Coreline hybrid inverterContinuous output [CONFIRM]
  • Transferpoint automatic transfer switchRating [CONFIRM]
  • Loadset critical-loads subpanelCircuits [CONFIRM]
  • Gridsense monitoringFeatures [CONFIRM]

[CONFIRM — client's actual equipment lines and installer certifications]

White electrical and battery enclosures with cable glands inside an open cabinet

Safety and siting

Where a battery can go

[PLACEHOLDER: 2–3 sentences — client to supply]

Enclosure location
[CONFIRM]
Clearances
[CONFIRM]
Ventilation
[CONFIRM]
Fire code and permitting
[CONFIRM — requirements vary by state and AHJ]
Chemistry
[CONFIRM]
Listings and standards
[CONFIRM — do not print a standard number that has not been evidenced]
Shopfront at night with warmly lit display windows against a dark exterior

Small business

Keeping the essentials running

POS terminals, refrigeration, servers, pumps and lighting. [PLACEHOLDER: 2–3 sentences — client to supply]

Crew

Who installs it

[PLACEHOLDER: 2–3 sentences — client to supply]

[NAME — CONFIRM][ROLE — CONFIRM]
[NAME — CONFIRM][ROLE — CONFIRM]
[NAME — CONFIRM][ROLE — CONFIRM]

Questions

Frequently asked

Not without storage. A grid-tied solar system without a battery shuts down automatically when the grid goes down, so that it doesn't send power into lines utility crews may be working on. Your home loses power just as it would without solar — even in daylight.

Keeping power on during an outage requires battery storage and transfer equipment configured for backup.

Only the circuits the system was configured to back up. With a critical-loads setup, that is the defined set of circuits moved to the backed-up subpanel; everything else stays off until the grid returns. With a whole-home setup, the whole panel is backed up, but high-draw appliances may still be limited or managed.

Which circuits are backed up is agreed in writing before installation.

[PLACEHOLDER: 2–3 sentences — depends on the existing inverter; confirmed on site — client to supply]

[PLACEHOLDER: 2–3 sentences — client to supply]

[CONFIRM — depends on configuration and tariff] [PLACEHOLDER: 2–3 sentences — client to supply]

[CONFIRM] [PLACEHOLDER: 2–3 sentences — client to supply]

[TYPICAL DURATION — CONFIRM] [PLACEHOLDER: 2–3 sentences — client to supply]

[CONFIRM] [PLACEHOLDER: 2–3 sentences — client to supply]

Assessment request

Check my backup options

[PLACEHOLDER: 2–3 sentences — client to supply]

  1. Property
  2. Power & outages
  3. Timing & contact

Property and existing system

Do you own this property?
Property type
Do you already have solar?
Roof age

Asked even for battery-only — many storage projects add solar later.

Roof condition

Power and outages

Average monthly electric bill

A range is all we need.

Type your utility's name — no preset list.
How often do you lose power?
What do you most need to keep running?

Select all that apply.

Backup preference

Timing and contact

Timeline
Financing interest
Used for the service-area check.

Backup scope and duration are determined at the site assessment. Nothing on this site is an offer, a guarantee of runtime, or a guarantee of savings.

Call Check backup options
DEMO — ThinkFirst Studios · [Your name here]