Process
Five phases, one written scope
[PLACEHOLDER: 2–3 sentences — client to supply]
-
Phase 01
Load and site assessment
- What happens
- Panel inspection, load list and siting. [PLACEHOLDER: 2–3 sentences — client to supply]
- What we need from you
- Access to the panel and proposed battery location
- What you receive
- Assessment notes
- Typical duration
- [CONFIRM]
-
Phase 02
System design and backup-scope agreement
Agreed in writing
The backup scope is agreed in writing before installation — which circuits are backed up and which are not. [PLACEHOLDER: 2–3 sentences — client to supply]
- What happens
- Equipment selected and the backed-up circuits defined. [PLACEHOLDER: 2–3 sentences — client to supply]
- What we need from you
- Decisions on which circuits matter
- What you receive
- Design and written backup scope
- Typical duration
- [CONFIRM]
-
Phase 03
Permitting, fire-code review and utility notification / interconnection
- What happens
- Applications to the AHJ and utility. [PLACEHOLDER: 2–3 sentences — client to supply]
- What we need from you
- Signatures and authorisations
- What you receive
- Permit and application status
- Typical duration
- [CONFIRM]
-
Phase 04
Installation and transfer-equipment commissioning
- What happens
- Battery, inverter, subpanel and transfer equipment installed. [PLACEHOLDER: 2–3 sentences — client to supply]
- What we need from you
- Site access; power may be off for part of the day [CONFIRM]
- What you receive
- Installed system
- Typical duration
- [CONFIRM]
-
Phase 05
Configuration, outage test and monitoring handover
- What happens
- Settings configured and an outage simulated. [PLACEHOLDER: 2–3 sentences — client to supply]
- What we need from you
- Presence for the walkthrough
- What you receive
- Monitoring access, written scope, warranty documents
- Typical duration
- [CONFIRM]
Start with a load assessment
[PLACEHOLDER: one sentence — client to supply]