NBR 5410
The Brazilian standard for low-voltage electrical installations. It is what separates an installation that is properly done from one that merely works.
Home CELESC grid connection
It is the part almost no solar site explains, and the part that generates the most complaints afterwards. Each stage below says who does it: Sollar Sul, CELESC or you. What sits with the utility is outside any installer’s control — and anyone promising a date is promising something that is not theirs to promise.
How grid connection works
This is the block that does not exist on any solar site in Floripa, and it is exactly what every buyer is anxious about. Five stages, in plain language, saying who does each one.
We read your consumption history off the CELESC bill and look at the roof, its orientation and shading. This is where you find out whether the project makes sense at all.
Sollar SulThe design is signed by a CREA-registered professional, who issues the ART — the formal record of technical responsibility (Lei 6.496/1977). [CONFIRM who the responsible engineer is]
Sollar SulThe access request and the utility opinion, under the distributed-generation rules consolidated by Lei 14.300/2022. [CONFIRM whether Sollar Sul carries this process]
CELESCMounting, cabling, inverter and protections. The electrical side follows NBR 5410.
Sollar SulThe utility inspects and swaps the meter for a bidirectional one. From that point the system is connected and approved.
CELESCThis is the block that does not exist on any solar site in Floripa, and it is exactly what every buyer is anxious about. Five stages, in plain language, saying who does each one.
Safety and compliance
This is not a legal disclaimer — it is the strongest sales argument this business has, because a good deal of the competition issues no ART at all.
The Brazilian standard for low-voltage electrical installations. It is what separates an installation that is properly done from one that merely works.
The formal record of technical responsibility, issued by a CREA-registered professional (Lei 6.496/1977). It is the document that says who is technically answerable for the work.
The responsible engineer registration. [CONFIRM the registration and the name] — no number has been invented in this mockup.
An installation with no ART can become a problem with insurance and on resale, because there is nobody formally responsible for it.
Warranty
Durable goods and services carry a 90-day statutory warranty from delivery (CDC art. 26, II). It applies whether it is written down or not.
Any longer period is contractual and must be given in writing (CDC art. 50). [CONFIRM the terms]
Panel and inverter each carry their own warranty, typically long and heavily conditioned. Neither has been described here, because neither has been read. [CONFIRM both]
FAQ
It depends on two things: what sits with the installer and what sits with the utility. Nobody who installs panels controls the second part. Typical timeframe [CONFIRM] — no number has been estimated here.
A professional registered with CREA, who takes on technical responsibility for the work (Lei 6.496/1977). Who that professional is at Sollar Sul [CONFIRM].
Yes — a grid-tied system requires an access request and utility approval. Who files it, the installer or you, is the question to ask before signing [CONFIRM].
Surplus enters the distributed-generation compensation scheme, whose legal framework is Lei 14.300/2022. The rules changed and carry a transition regime, so this site publishes no promise of compensation, tariff or acquired right without a dated source [CONFIRM with source and date].
On an ordinary grid-tied system, no. When the grid drops the inverter shuts down for safety — including to protect line workers. Only a battery and a suitable inverter keep a load running. That is the honest answer, and hardly anyone gives it before the sale.
Yes, periodically — dust, sea air and leaves cut output. Frequency and whether it falls under a maintenance contract [CONFIRM].
There are three and they are not the same thing: a 90-day statutory warranty (CDC art. 26, II), a written contractual warranty on the installation (art. 50), and the factory warranties on panel and inverter, which are separate and carry their own conditions. [CONFIRM all three]
[CONFIRM whether they do and during what hours] — nothing has been assumed.
This site publishes no savings percentage and no payback period, deliberately: those numbers depend on your tariff, your consumption, the pitch and shading of your roof and the compensation rules in force. Send your bill and the conversation starts from real data instead of a brochure figure.
Request your quote
Solar is the one service on this site where a form beats WhatsApp, because the quote needs structured input. The field that matters is average consumption in kWh.
Would rather send a photo of the bill? Send it on WhatsApp.
Message on WhatsApp
No savings percentage and no payback promise — just a reading of your consumption, what can be done on your roof, and a prior written estimate.