CREA-SC [CONFIRM] Phone [CONFIRM] Hours [CONFIRM]
Sollar SulSolar and electrical · Florianópolis
Photovoltaic panels installed on a building roof against an open sky at dusk, mounting rails visible and no people in frame. Stock photograph used as a placeholder.

Sollar Sul · Florianópolis — Brazil

Solar and electrical work, with the paperwork done

The hard part of a photovoltaic system is not the panel — it is the ART, NBR 5410 and the CELESC grid connection. That is what this site is about.

Choose your path

These are two businesses, and you came for one of them

Someone with a burning smell in the distribution board and someone sizing a photovoltaic system have nothing in common except the contractor. One is an emergency, the other is a planned investment — which is why the site splits here, on the first screen.

Aerial view of a row of photovoltaic panels over grass, no people. Stock photograph used as a placeholder.
Solar energy

Solar energy

A five-figure investment attached to a property. It starts with your electricity bill and ends with the meter changed.

A network patch panel with labelled blue cables and numbered ports, no people. Stock photograph used as a placeholder.
Electrical installation

Electrical installation

Distribution board, earthing, service entrance, fault-finding. Often urgent, which is why the phone comes before the form.

Solar

What goes into a photovoltaic system

No system size, no price and no brand. None of the three has been verified, and none appears here until the business supplies it.

Feasibility assessment

Roof orientation, shading, available area and your actual consumption read off the CELESC bill — not a rule of thumb.

Design and sizing

The system is sized against your consumption history. No system size appears on this site without that history in hand.

On-grid installation

Mounting, DC and AC wiring, string configuration and protections, with the electrical side executed to NBR 5410.

CELESC grid connection

The access request and approval process with the utility. Who carries that process — us or you — is the most important question in this quote. [CONFIRM who carries it]

Off-grid, hybrid and storage

Whether they do any battery work at all [CONFIRM] — nothing has been assumed here.

Monitoring and maintenance

Cleaning, inverter monitoring and periodic inspection. Frequency and scope [CONFIRM].

How grid connection works

From "I want solar" to the meter changed

This is the block that does not exist on any solar site in Floripa, and it is exactly what every buyer is anxious about. Five stages, in plain language, saying who does each one.

  1. Bill analysis and feasibility

    We read your consumption history off the CELESC bill and look at the roof, its orientation and shading. This is where you find out whether the project makes sense at all.

    Sollar Sul
  2. Design and the ART issued by the responsible engineer

    The design is signed by a CREA-registered professional, who issues the ART — the formal record of technical responsibility (Lei 6.496/1977). [CONFIRM who the responsible engineer is]

    Sollar Sul
  3. Access request to CELESC

    The access request and the utility opinion, under the distributed-generation rules consolidated by Lei 14.300/2022. [CONFIRM whether Sollar Sul carries this process]

    CELESC
  4. Installation

    Mounting, cabling, inverter and protections. The electrical side follows NBR 5410.

    Sollar Sul
  5. Inspection and meter change

    The utility inspects and swaps the meter for a bidirectional one. From that point the system is connected and approved.

    CELESC
How long does it take? No typical timeline appears here because none has been confirmed [CONFIRM the typical timeline] — and because part of it is utility processing time, which is outside any installer control. Saying so is more honest than promising weeks.
STOCK Adult gloved hands connecting cables on a photovoltaic panel, no face in frame. Stock photograph used as a placeholder.

From "I want solar" to the meter changed

This is the block that does not exist on any solar site in Floripa, and it is exactly what every buyer is anxious about. Five stages, in plain language, saying who does each one.

How grid connection works →

Electrical

What goes into an electrical installation

Executed to NBR 5410, the Brazilian standard for low-voltage electrical installations — naming the standard is a credential, not jargon.

Residential electrical installation

New build and full rewire, executed to NBR 5410.

Distribution board, breakers, RCD and SPD

Bringing the distribution board up to standard with a residual-current device and surge protection — and surge protection is genuinely relevant on this island.

Earthing and lightning protection

Earthing, and lightning protection under NBR 5419 — which is a separate discipline. [CONFIRM whether they do SPDA]

CELESC service entrance

Meter box installation and compliance with the utility standard.

Inspection and report

Inspection, thermography and fault-finding. Report scope [CONFIRM].

EV charger installation

The obvious neighbour to solar, and the easiest question to ask someone who has just had panels fitted. [CONFIRM whether they do this]

Emergency callouts [CONFIRM whether they offer them and on what hours] — nothing has been assumed here, and if they do, the phone moves to the top of this page.

Safety and compliance

Why you should demand an ART from your installer

This is not a legal disclaimer — it is the strongest sales argument this business has, because a good deal of the competition issues no ART at all.

NBR 5410

NBR 5410

The Brazilian standard for low-voltage electrical installations. It is what separates an installation that is properly done from one that merely works.

ART

ART

The formal record of technical responsibility, issued by a CREA-registered professional (Lei 6.496/1977). It is the document that says who is technically answerable for the work.

CREA-SC

CREA-SC

The responsible engineer registration. [CONFIRM the registration and the name] — no number has been invented in this mockup.

What happens without an ART

What happens without an ART

An installation with no ART can become a problem with insurance and on resale, because there is nobody formally responsible for it.

If Sollar Sul neither holds nor contracts a CREA-SC registration, this entire section has to be rewritten and the site must not imply technical responsibility the business does not have. It is the first thing to resolve. [CONFIRM]

Projects

Installed work

Captions by type and neighbourhood. No caption carries a kWp or a generation figure, because none has been documented — and a generation number in a caption is a performance claim.

Request your quote

The number that changes everything is on your electricity bill

Solar is the one service on this site where a form beats WhatsApp, because the quote needs structured input. The field that matters is average consumption in kWh.

Where to find it: on the CELESC bill, look for the 12-month consumption history and take the average in kWh. That number is the difference between a real quote and a guess.

STOCK Bills and documents with a calculator and a pen on a table, seen from above, with no readable personal data. Stock photograph used as a placeholder.
A prior written estimate itemising labour, materials and dates (CDC art. 40), binding for 10 days from receipt unless otherwise agreed — and nothing outside it can be charged without authorisation.
What about uploading the bill? An electricity bill carries a name, an address, an installation number and a consumption pattern — personal data with real weight. So this mockup does not implement an upload: the safer path is to send a photo on WhatsApp, and if an upload really is wanted it needs a stated purpose, a retention period and a deletion route in the policy. [CONFIRM whether they want the upload]

Would rather send a photo of the bill? Send it on WhatsApp.
Message on WhatsApp

Service area

Island and mainland, all inside CELESC territory

Worth saying out loud: all of this area sits in CELESC concession territory, and CELESC is the utility the grid connection is done with. Real coverage, mainland travel and any callout charge [CONFIRM].

Schematic map of greater Florianópolis with the localities served A simplified drawing: the mainland on the left, Santa Catarina island on the right and the bridge between them, with markers on the localities. It is not a navigation map. CampecheRio TavaresLagoaInglesesSto AntonioCentroRibeiraoJurereCanasvieirasSao JosePalhocaBiguacu Everything marked sits in CELESC concession territory
A drawing, not a navigation map — and no third-party map is loaded in this mockup.
  • Campeche
  • Rio Tavares
  • Lagoa da Conceição
  • Ingleses
  • Santo Antônio de Lisboa
  • Centro
  • Ribeirão da Ilha
  • Jurerê
  • Canasvieiras
  • São José
  • Palhoça
  • Biguaçu
Worth saying out loud: all of this area sits in CELESC concession territory, and CELESC is the utility the grid connection is done with. Real coverage, mainland travel and any callout charge [CONFIRM].
STOCK An adult crew in hard hats carrying a ladder, seen from below against the sky. Stock photograph used as a placeholder.

About

Who does the work

Everything in this section is open. The only public source for this business is an Instagram profile behind a login wall: there is no founding year, no team size, no count of systems installed and no cumulative capacity — and none of it has been written in on our own initiative.

  • Base and area covered [CONFIRM]
  • Years in operation [CONFIRM]
  • Team size [CONFIRM]
  • Responsible engineer and CREA-SC [CONFIRM]
  • Residential, commercial or rural [CONFIRM]
  • Emergency callouts [CONFIRM]

Warranty

There are three separate warranties

Legal warranty — 90 days

Durable goods and services carry a 90-day statutory warranty from delivery (CDC art. 26, II). It applies whether it is written down or not.

Installation warranty

Any longer period is contractual and must be given in writing (CDC art. 50). [CONFIRM the terms]

Manufacturer warranty

Panel and inverter each carry their own warranty, typically long and heavily conditioned. Neither has been described here, because neither has been read. [CONFIRM both]

If any financing or instalment option is offered, it must show the cash price, the total instalment price, the number and value of instalments and the interest rate (CDC art. 52 and Decreto 5.903/2006). Naming a bank or a credit line needs the partner permission. [CONFIRM]

FAQ

What people ask before signing

How long does grid connection take?

It depends on two things: what sits with the installer and what sits with the utility. Nobody who installs panels controls the second part. Typical timeframe [CONFIRM] — no number has been estimated here.

Who issues the ART?

A professional registered with CREA, who takes on technical responsibility for the work (Lei 6.496/1977). Who that professional is at Sollar Sul [CONFIRM].

Does CELESC have to be notified?

Yes — a grid-tied system requires an access request and utility approval. Who files it, the installer or you, is the question to ask before signing [CONFIRM].

What happens to surplus energy?

Surplus enters the distributed-generation compensation scheme, whose legal framework is Lei 14.300/2022. The rules changed and carry a transition regime, so this site publishes no promise of compensation, tariff or acquired right without a dated source [CONFIRM with source and date].

Does it work in a blackout?

On an ordinary grid-tied system, no. When the grid drops the inverter shuts down for safety — including to protect line workers. Only a battery and a suitable inverter keep a load running. That is the honest answer, and hardly anyone gives it before the sale.

Do panels need cleaning?

Yes, periodically — dust, sea air and leaves cut output. Frequency and whether it falls under a maintenance contract [CONFIRM].

What is the warranty?

There are three and they are not the same thing: a 90-day statutory warranty (CDC art. 26, II), a written contractual warranty on the installation (art. 50), and the factory warranties on panel and inverter, which are separate and carry their own conditions. [CONFIRM all three]

Do you take electrical emergencies?

[CONFIRM whether they do and during what hours] — nothing has been assumed.

How much will I save?

This site publishes no savings percentage and no payback period, deliberately: those numbers depend on your tariff, your consumption, the pitch and shading of your roof and the compensation rules in force. Send your bill and the conversation starts from real data instead of a brochure figure.

Testimonials

This section is empty on purpose

No testimonial was written for this mockup, and no rating, review count or stock portrait appears as a customer. It goes in when there is a real, permissioned testimonial.

[CONFIRM — a real testimonial, with written permission]
[CONFIRM]
[CONFIRM — a real testimonial, with written permission]
[CONFIRM]
[CONFIRM — a real testimonial, with written permission]
[CONFIRM]

Send your electricity bill on WhatsApp and get an assessment

No savings percentage and no payback promise — just a reading of your consumption, what can be done on your roof, and a prior written estimate.

Phone [CONFIRM]